BC Environmental and Occupational Health Research NetworkConnecting and supporting people to create excellence in research and training in occupational and environmental health |
||
Keyword search |
||
Green Building Design: Water Quality and Utility Management ConsiderationsAgency: WRF This project has two objectives. The primary objective is to predict/evaluate how green building designs may impact water quality issues in building premise plumbing or possibly the distribution system (from reduced demand, etc.). The secondary objective is to collect, compile and report on non-water-quality-related impacts of green building and off-grid green building designs on centralized water utility system operations addressing such concerns as rate payer equity, service and connection charges, incentives or rebates, fire service supply, supply redundancy, main sizing, codes, and standards. Deadline: June 10, 2011 Details: Last updated May 16, 2011 |
||
|
Copyright © 2008-2012 BC Environmental and Occupational Health Research Network. All rights reserved. |
||